machine transport

Hier you find information on machine transport

THE CHEAPEST WAY IS TO DO IT THE COREKT WAY

Contact trumpf or a professionel engineer to get the neded information

.

To move a machine is a comprehensive work.
which requires planning and ongoing planing.

First the machine must be TRANSPORT SECURED. this must be done by engineer.
And then the machine can be disassembled and packed correctly.

you then lift the machine on the truck with special spreader bar to avoid damage to the machine.

to dismantle a machine and load on truck take apr. 1 week.

.
Now the machine is ready for transport.

but most machines are 3 meter wide and therefore exceeds the normal width of truck.

this required special transport with warning lights and signs.

but 4 and 6 meter machines is up to 3,7 meter white and need 2 truks for transport.

that can only special transport company handle that why transportation often is very expensive.

in some countries extra car with warning signs or police escort is needed. which of course costs extra.

.

machines to be shipped by boat.

must be transported by truck to the harbor for packing.

machine then requires special package to protect the machine from saltwater that destroy the machine.

it is very expensive to pack a machine for sea transport..!!!!!

.

Maybe this pictures explain better the high transportation cost

to pack machine for see transport take apr. 2-3 weeks

.

.

machine to be send by truck.

ether to new factory or to the harbor for sea packing.

Note the photo show a trumpf L3030    3 meter machine

.

.

machine send by boat / sea packing.

.

This image has an empty alt attribute; its file name is Sea-packing-ship.jpg

you want to save money..!!!! Contact professionel engenears

THIS IS WHY THE PACKING FOR TRANSPORT IS SO IMPORTANT…