data for foundation to use by most trumpf machines

 DEMAND TO INSTALLATION in factory

NOTE we recommend a trumpf engineer to install the laser machine, this is to make sure your machine work properly after installation

Floor must be min 200 mm thick with arming no cracks or connections in arrear where main machine must stand. this is to make sure machine not move and change setting

for some special machines the foundation must be 300 mm this with steel armory

also take into consideration that in cold aires wer it freezes strong outside that the ground can move near the wall so make sure the machine is not to close to the wall

in cold country temperature in factory must NOT drop below +5 deg due to cooling water du to freezing water

in hot country the temperatyre must not exide 30 and 43 deg depending on the cooling unit and age of the unit

in hot country we recommend to move the cooling unit where it can get most cool and fresh air

the recommended temperature is + 15 to +30 deg

but best operating temp is +20 to +25 deg